Könyv End to End Delay Analysis in Wireless Sensor Networks Jammi Ashok

End to End Delay Analysis in Wireless Sensor Networks

Basics, Multi Path Routing in WSN, Methods

Nyelv: Angol
Kötés: Puha kötésű
Elérhetőség: Beszállítói készleten
Küldés 5-8 napon belül
10 029 Ft
This text book describes the analysis on end-to-end delay for wireless sensor network using multi pa...

Információk a könyvről

Nyelv
Angol
Kötés
Könyv - Puha kötésű
Kiadva
2016
oldal
80
EAN
9783659956980
Enbook ID
15201398
Súly
137
Méretek
150 x 220 x 5

Teljes leírás

This text book describes the analysis on end-to-end delay for wireless sensor network using multi path routing protocols. The analysis on end to end delay refers to the total time taken for a single packet to be transmitted across a network from source to destination. It is one of the most important and fundamental issue for wireless sensor networks. A novel multi path routing protocol based on ant colony optimal (ACO) has been explained with suitable algorithm and examples. MRP improves the efficiency of data aggregation, thus, reducing the energy consumption. An improved ACO algorithm can be used to search for the optimal and sub optimal paths based on many metrics, which can balance the energy consumption among nodes. Furthermore, a load balancing function is presented for dynamically choosing one path to transmit data. This text book covers basics, multi path routing techniques and analysis on end to end delay in WSN and will be very much useful for the students and scholars who are interested in the research area of Wireless Sensor Networks.

Érdekelheti

7 574 Ft

Batteries Not Included

Robert Beringer
5 714 Ft
13 477 Ft

Fall of Mexico

Edward Jerningham
6 857 Ft
4 049 Ft

Killshot

Aria Michaels
6 886 Ft
16 824 Ft

The Curse of Capistrano

Johnston McCulley
4 751 Ft

Shopify

Brett Standard
5 293 Ft
4 533 Ft

Random Thoughts

Dean Sparks
3 976 Ft
10 160 Ft
10 523 Ft
2 484 Ft

Azok a vásárlók, akik ezt a könyvet megvásárolták, a következőket is megvásárolták

Vita nostra

Marina Djachenko
7 148 Ft

Gemalte Wörter

Edoardo Fazzioli
6 591 Ft
9 777 Ft
16 577 Ft
8 961 Ft
5 220 Ft

El cost de l'energia

Riba Sanmartí
9 254 Ft
8 286 Ft