Könyv Practical Schedule Risk Analysis David Hulett

Practical Schedule Risk Analysis

Szerző: David Hulett
Nyelv: Német
Kötés: Puha kötésű
Elérhetőség: 50 % esély
Keressük az egész világon
20 672 Ft
Project scheduling is required for good project management, and the schedule represents the project...

Információk a könyvről

Szerző
Nyelv
Német
Kötés
Könyv - Puha kötésű
Kiadva
2024
oldal
240
EAN
9781032837963
ISBN
1032837969
Enbook ID
45788701
Súly
446
Méretek
174 x 246

Teljes leírás

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project''s schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path''s completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

Érdekelheti

Azok a vásárlók, akik ezt a könyvet megvásárolták, a következőket is megvásárolták

5 230 Ft

5 Seras

Gabriel Briggs
4 495 Ft
7 482 Ft
19 160 Ft

Big Fix

Rob Childs
3 380 Ft