Könyv Project Management with Dynamic Scheduling Mario Vanhoucke

Project Management with Dynamic Scheduling

Szerző: Mario Vanhoucke
Nyelv: Angol
Kötés: Kemény kötésű
Kiadó: Springer
Elérhetőség: 50 % esély
Keressük az egész világon
39 054 Ft
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of p...

Információk a könyvről

Szerző
Nyelv
Angol
Kötés
Könyv - Kemény kötésű
Kiadva
2012
oldal
310
EAN
9783642251740
ISBN
3642251749
Enbook ID
01229675
Kiadó
Súly
627
Méretek
165 x 245 x 24

Teljes leírás

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project s time and cost reserves.

Érdekelheti

Chloroplast Biogenesis

Udaya C. Biswal
57 758 Ft
22 591 Ft

Rev Me Up

Kylie Gilmore
5 422 Ft

MACROLEPIDOPTERA OF THE WORLD

Adalbert 1860-1938 Seitz
8 582 Ft
4 870 Ft

Tarot

JEFF NEVES
8 982 Ft
34 400 Ft

Living with Wine

Samantha Nestor
24 754 Ft
2 944 Ft
15 813 Ft

Without Warning

Lynette Eason
6 535 Ft
27 739 Ft

PUPIL AS SCIENTIST

Rosalind Driver
13 964 Ft

Azok a vásárlók, akik ezt a könyvet megvásárolták, a következőket is megvásárolták

8 425 Ft

18 STUDIES OP. 109 PIANO

FRIEDRICH BURGMULLER
6 944 Ft
2 249 Ft
2 617 Ft