Könyv Project Management with Dynamic Scheduling Mario Vanhoucke

Project Management with Dynamic Scheduling

Baseline Scheduling, Risk Analysis and Project Control

Szerző: Mario Vanhoucke
Nyelv: Angol
Kötés: Kemény kötésű
Elérhetőség: Beszállítói készleten
Küldés 10-13 napon belül
84 874 Ft
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of p...

Információk a könyvről

Szerző
Nyelv
Angol
Kötés
Könyv - Kemény kötésű
Kiadva
2013
oldal
318
EAN
9783642404375
ISBN
3642404375
Enbook ID
02007051
Súly
658
Méretek
164 x 250 x 25

Teljes leírás

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. §In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project s time and cost reserves.§The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".§

Érdekelheti

Portuguese Studies 31

Claudia Pazos Alonso
14 595 Ft
13 038 Ft

Papers by Command, Volume 8

Great Britain Parliament House of Comm
15 994 Ft
6 991 Ft
4 967 Ft

For the Defence

Fergus Hume
8 319 Ft

Alarmstart East

Patrick G. Eriksson
8 805 Ft

Auntie's War

Edward Stourton
6 461 Ft

A Haunt for Jackals

Benjamin Westbrook
4 863 Ft

Azok a vásárlók, akik ezt a könyvet megvásárolták, a következőket is megvásárolták

Rozpletení uzlu

Meghan Quinn
5 637 Ft
24 898 Ft

Philosoph fur die Welt

Engel Johann Jakob Engel
9 443 Ft

Wollust

Clay F. Cassidy
2 780 Ft
30 215 Ft

Die Ursachen der Teuerung.

Eduard Wilhelm Sand
7 136 Ft
10 514 Ft
9 286 Ft